Projects
Projects are grouped into three categories – 1) Sponsor
Projects, 2) Projects related to Web Course Development, and 3) Consultancy
Projects
1) Sponsor Projects
Sl. No. |
Title of the Project |
Sponsor |
Ref. No. and other details |
PI/co-PI |
Status |
1 |
Hydroclimatological characteristics of spatio-temporal
rainfall distribution over India |
Indian Institute of Technology Bombay, Mumbai, India |
07IR020 |
PI |
Completed |
2 |
Assessment of hydroclimatic teleconnection for basin-scale, real-time
streamflow and its use in real-time streamflow forecasting |
Fast Track Project for Young Scientists Scheme, Science and Engineering
Research Council (SERC), Department of Science and Technology (DST), Govt. of
India |
SR/FTP/ETA-26/07 (IITKgp project code – RTS) |
PI |
Completed The project was graded as ‘Excellent’
by SERC, DST (Ref. No. SR/FTP/ ETA-26/2007 dated 9th May 2014) |
3 |
River basin stream flow simulation using remote sensing data |
Space Application Centre (SAC), Indian Space Research Organization
(ISRO), Ahmedabad |
IIT/SRIC/CE/RSD/2009-2010 (IITKgp project code – RSD) |
PI |
Completed |
4 |
Managing change in Soil Moisture and Agricultural Productivity under a
Global Warming scenario using a Catchment Scale Climate Change Assessment
Framework |
Australia-India Strategic Research Funds (AISRF) |
Bi-lateral Project Between India and Australia Ref. No. DST/INT/AUS/P-27/2009 (IITKgp project code – CAF) |
Indian Co-PI |
Completed |
5 |
Smarter water resources management, Disaster Mitigation & Diabatic Retinopathy (WDD) |
IBM India Private Limited |
IIT/SRIC/WDD/2011-20112/165 (IITKgp project code – WDD) |
Co-PI |
Completed |
6 |
Probabilistic simulation and future estimation of soil moisture distribution over India using Hydroclimatic data |
ISIRD, SRIC, IIT Kharagpur |
IIT/SRIC/ISIRD/2012-2013 (IITkgp project code – FSH) |
PI |
Completed |
7 |
Probabilistic estimation of soil moisture from RISAT1 data along with uncertainty quantification |
Space Application Centre (SAC), Indian Space Research Organization
(ISRO), Ahmedabad. |
IIT/SRIC/CE/PMA/2013-14/5 (IITkgp project code – PMA) |
PI |
Completed |
8 |
Effect of Climate Change on local sea level rise and its Impact on Coastal Areas: Kolkata Region as a Pilot Study |
Ministry of Human Resource Development (MHRD), Government of India. |
F.No. 4-22/2014-TS.I, Dt 23-01-2014 (IITKgp Project code – ILC) |
PI |
Completed |
9 |
Spatio-temporal drought characterization and its future trend in Iran in a changing climate |
India-Iran inter-governmental programme of
cooperation in science and technology, Department of Science & Technology
(International Bilateral Co-operation Division) |
Bi-lateral Project Between India and Iran (INT/Iran/ JP-07/2018 dated September 12, 2018) |
Indian PI |
Completed |
10 |
Modelling of Soil Moisture in a Changing Climate using the Potential of Probabilistic Hydrometeorological Approach |
Ministry of Earth Science (MoES), DST |
MoES/PAMC/H&C/30/2013-PC-II (IITkgp project code – MHA) |
PI: Dr. Rajib Maity Co-PI: Nil |
Completed |
11 |
Exploration of vertical soil moisture profile by assimilating the surface soil moisture data retrieved from remotely sensed SAR data |
Space Application Centre (SAC), Indian Space Research Organization
(ISRO), Ahmedabad. |
IT/KCSTC/STC/Chair./Appr./NEW/P/16-17/07 |
PI: Dr. Rajib Maity Co-PI: Nil |
Completed |
12 |
Vulnerability and Risk Assessment due to Various Environmental Drivers in a Climate Change Scenario over Eastern India |
Department of Science and Technology, Climate Change Programme (SPLICE), |
IIT/SRIC/NA/VDI/2016-17/239 |
Co-PI |
Completed |
13 |
Assessment of extreme hydrological events in a changing climate |
Department of Science and Technology, Climate Change Programme (SPLICE), |
DST/CCP/CoE/79/2017(G),
Dt. 30-03-2017 |
PI |
Completed |
14 |
Improvement of temporal resolution (~weekly to daily) of Sentinel-1 based high spatial resolution surface soil moisture estimates |
Space Application Centre (SAC), Indian Space Research Organization (ISRO), Ahmedabad. |
IIT/KCSTC/Chair/NEW/P/19-20/09 |
PI |
Ongoing |
15 |
Concept of temporal networks in hydroclimatic modelling in a changing climate: Application to streamflow and drought |
Ministry of Earth Science (MoES), DST. |
MoESfPAMCIH&CI12412019-PC-II |
PI |
Ongoing |
2) Projects related to Web Course Development
Sl. No. |
Title of the Project |
Sponsor |
Ref. No. and other details |
Status |
1 |
National Mission Project on Pedagogy Development for the course ‘Water
Resources Engineering’ |
Ministry of Human Resource Development (MHRD), Government of India |
Project coordinated by Centre for Education Technology (CET), IIT
Kharagpur (Worked as Principle Developer with another Co-Developer) |
Completed |
2 |
Development of a video course on ‘Probability Methods in Civil
Engineering’ though National Programme on
Technology Enhanced Learning (NPTeL-II) |
Ministry of Human Resource Development (MHRD), Government of India |
Project coordinated by Centre for Education Technology (CET), IIT
Kharagpur (Worked as an Subject Matter Expert (SME); No co-SME) |
Completed |
3 |
Development of a web course on ‘Probability Methods in Civil
Engineering’ though National Programme on
Technology Enhanced Learning (NPTeL-II) |
Ministry of Human Resource Development (MHRD), Government of India |
Project coordinated by Centre for Education Technology (CET), IIT
Kharagpur (Working as an Subject Matter Expert (SME); No co-SME) |
Completed |
4 |
NPTEL Online Certification (NOC) Course on “Probability Methods in
Civil Engineering” |
Ministry of Human Resource Development (MHRD), Government of India |
Project coordinated by Centre for Education Technology (CET), IIT
Kharagpur (Working as an Subject Matter Expert (SME); No co-SME) |
Completed |
5 |
NPTEL Online Certification (NOC) Course on “Surface Water Hydrology” |
Ministry of Human Resource Development (MHRD), Government of India |
Project coordinated by Centre for Education Technology (CET), IIT
Kharagpur (Working as an Subject Matter Expert (SME); No co-SME) |
Completed |
3) Consultancy Projects
Sl. No. |
Title of the Project |
Client |
Ref. No. and other details |
PI/co-PI |
Status |
1 |
Expert’s Opinion on open channel ultrasonic flow meter. |
City & Industrial Development Corporation (CIDCO) of Maharashtra
Ltd., Mumbai |
DRD/CE/TIE-2/07-08 |
Co-PI |
Completed |
2 |
Performance Evaluation Study on Flood Control Scheme for “Kapaleswari-Keliaghai-Baghai” Drainage Basin for Phase-I, 2010-2011 |
Superintending Engineer, Western Circle-II, I&W Directorate, Dist. Paschim Mednipur, Govt. of West
Bengal |
IIT/SRIC/CE/2010-2011/105 (IITKgp project code – KKBD |
PI |
Completed |
3 |
Vetting the design of DNMC canal and associated hydraulic structures |
Scott Wilson India Private Limited (SWIPL), A-26/4, Mohan Cooperative
Industrial Estate, Mathura Road, New Delhi-110044 |
IIT/SRIC/CE/2011-2012/28 (IITKgp project code – CSTI) |
PI |
Completed |
4 |
Performance Evaluation Study on Flood Control Scheme for “Kapaleswari-Keliaghai-Baghai” Drainage Basin for Phase-II, 2012-2013 |
Superintending Engineer, Western Circle-II, I&W Directorate, Dist. Paschim Mednipur, Govt. of West
Bengal |
IIT/SRIC/CE/REDS/2012-2013/44 (IITKgp
project code – REDS) |
PI |
Completed |
5 |
Evaluation of Flood Management Scheme for Keliaghai-Kapaleswari-Baghai
River Basin |
Superintending Engineer, Western Circle-II, I&W Directorate, Dist. Paschim Mednipur, Govt. of West
Bengal |
IIT/SRIC/CE/FMKR/2015-15/04 (IITKgp
project code – FMKR) |
PI |
Completed |
6 |
Scientific study
to formulate design parameters for the proposed diversion |
The Singareni Collieries Co. Ltd., Kothagudem Collieries Post |
IIT/SRIC/CE/SDPC/2022-2023/99999 (IITKgp project code – SDPC) |
PI |
Completed |
Last updated: June, 2023